PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing motorized damper controllers at the 2nd floor Facing South.jpg Installing sprinkler main raiser at Stair -2 4th Floor Facing East.jpg Laying out block at the 1st floor Sally ports Facing West.jpg Sprinkler main raiser at Stair -2 Facing East.jpg Started installing panel boards at the electrical room Facing East.jpg VAV boxes at the 2nd floor.jpg
Previous pageNext page Started installing panel boards at the electrical room Facing East
Started installing panel boards at the electrical room Facing East